I have been traveling for work for the last 2 weeks, I was home for one day between trips and I got a little bit done on the project. Luckily there are not any trips in the foreseeable future, so I should be able to get back on track. I am almost ready to start the engine for the first time. Today I made decent progress, I started setting the initial pitch of the ground adjustable prop. From this point on every job it the final step for that section and wont have to be repeated. Final fasteners are being installed and safety wire and cotter pins are being installed.
rudder cable fairing |
rudder final installation |
That's all I have this week, I will continue to add to this blog entry later this week