Instrument panel update

Not much progress to report. I went on Vacation to visit my Family in Detroit, so I just got back on the  plane last Sunday.  I completed the panel wiring and terminated all of the panel leads into a common plug. The mate is attached to the fuselage. I am working on a quick release hinge that I can use as an in flight emergency egress, but also as a quick release for the whole canopy. I want the canopy readily removable so I can attach a hoisting harness to the landing gear frame and the main Wing attach pins. Initially I will be operating out of Midway airport in Midlothian Texas. My friend  Pete and his wife Carol own "Big Q aviation" http://www.bigqaviation.com  They have 4 hangers on the field. I will be hoisting the Robin up to the ceiling in one of them.
Belite Instruments

The instrument panel was attached with 3/16" nut plates riveted to a .063" thick piece of precured NEMA electrical insulator fiberglass. That in turn was bonded to the instrument frame. I wrung out all of the circuits and checked the function. The switch on the right is the Engine kill. The switch at the bottom is the panel power and the potentiometer to the right of the power switch is the LED dimmer control. The center space in the panel will eventually have an audio -Vario. The lower space above the dimmer control will be a holder for my I- Phone. I  found a cool App for the I Phone that has a moving aeronautical chart display. its synced to the phones GPS. pretty damn cool!! The world lost another Thomas Edison when poor Steve Jobs died.
Spaghetti view
There are two large strain relief loops in the wire cable. this will allow the panel to be easily removed for service. This fwd section of the canopy will be fabric covered.
The next job on the canopy will be to install the latch and then the windshield. My plan is to complete every job short of covering by the end of the first week of December. I will have almost 4 weeks off after that and I plan on completing the covering. I have all of the materials on hand so the job should go smoothly. I purposely designed the ribs with 3/4" width so I can bond the fabric to the ribs instead of rib stitching.
 There are two large strain relief loops in the wire cable. this will allow the panel to be easily removed for service. This fwd section of the canopy will be fabric covered.
The next job on the canopy will be to install the latch and then the windshield. My plan is to complete every job short of covering by the end of the first week of December. I will have almost 4 weeks off after that and I plan on completing the covering. I have all of the materials on hand so the job should go smoothly. I purposely designed the ribs with 3/4" width so I can bond the fabric to the ribs instead of rib stitching. 

Instrumentation Cable

 This shows the Fuselage side termination. In addition to the wiring plug and socket, there is also a quick release for the Pitot tubing. I will modify the rear bulkhead with a slot so the cable sits under the hinge





Hinge parts


So here is what I finally came up with for a removable canopy hinge. I wracked my brain for a few days on this one. I have two design problems to solve. I need to be able to remove the canopy as a normal course of operation and I need to get rid of it if I have an emergency in flight. The part in my hand is permanently attached to to the canopy. The hinge, hinge plate and the hinge pin are permanentlyy attached to the fwd Turtle deck at the location of the previous hinge. 
Assembled Hinge


This shows the location of a 5/16" spring pin. The loading is reacted Heel to toe, between the upper flange and the pin. In flight there is about 100 lbs of lift load on the canopy, this lift load is taken by the spring pin. The pin passes through the retainer plate, hing plate and the last bulkhead, which has a wood bearing block in the canopy. A lanyard is attached to the spring pin and it exits out of the instrument panel on the R/H side (I am right handed) The emergency lanyard has a 3 inch relief loop that is attached to the instrumentation cable. One hard pull will release both the canopy and the plug. For ground operation, the lanyard is pulled only nought to release the spring pin.

Instrument panel, canopy and tail fairing Part 2

This is an update to the previous post. I am working on the modification of the Canopy frame to accept the instrument panel and increase the knee room. I laid out the trim of the solid bulkhead and then cut it out of the existing frame. The biggest problem was how to reinforce the core under the instrument panel attach screws. The core is 4.5lb/cu ft urethane foam. It will immediately crush when the screws are tightened up. I marked the location of the screws and then used a 1/4" drill to route out all of the foam within a 1/2 inch in each direction. The void will be filled with dry Micro balloon. This is Micro mixed to the consistency of dry dough. To ensure a good bond, the cavity is coated with raw epoxy.

Bulkhead and lower shear pane trimmed out
The tab outs are around the fabric stringers. The attach screws are between each of the stringers.

The plywood gussets are designed to smoothly transition the fabric  from a faceted flat to the curve of the bulkhead.











This is a good picture of the tab outs. The urethane foam core is shown. The lower shear panel was cut back, this exposed a Styrofoam edge. I do not like raw Styrofoam in the fuselage. One time during the Lakeland Airshow when I was building the Wren, one of the only other manufactures I ever met who was not very friendly came up to me and started yelling at me??? He complained that I was pushing the spirit of part 103 and I should just go back to Kansas and stop this madness!! He was quite famous and unfortunately(or fortunately) he is no longer with us. He was criticizing me for building a fuselage out of Styrofoam. Evidently he didn't level the same criticism at Steve Wood for his Sky Pup, but in any case, he told me that a single gas spill could drop me out of the air!!  That night around 2 am I heard a noise outside my camper , when I ran up to the Wren, she was soaked in gas. The whole lower panel was dissolved away. I sat up all night and repaired the fuselage by splicing in foam with 5 minute epoxy. I completed all of the repairs 30 minutes before the ultralights flew later that day. When Mr Pseudo-famous walked by the flight line, the look on his face proved beyond all doubt he was responsible!!

Anyway, that's why I don't like Styrofoam in a primary load path.!!

Shear panel close out
This is the closeout of the exposed shear panel edge. The technique here is to cut a 45 degree wedge away from the foam up to the cured glass. Dry Micro is then forced into the corner A layer of glass is then laid up over the exposed foam. When the micro cures, it forms a wedge shaped gusset. Once its fully cured (72 hours @74 degrees) the edge will be rounded over with a sanding block to keep from scraping the pilots legs.






boo saving me from a Frisbee attack
I live on the edge of the Hill country about 40 miles south of Dallas. Just south of me about 10 miles, it starts to open up like the Texas you see in the movies. There are lots of wild animals and recently there have been a number of pet dogs and cats that have been attacked and killed by mountain lions. But that's not the nastiest threat we have in Midlothian. While I was working away out on my shop minding my own business, a wild Frisbee attacked me, luckily My good ole boy Boo was there to protect me!!  I'll tell you, I will never have any dog other than an Australian Shepard. Its really fun to have a very smart dog!!

Instrument panel, canopy and tail fairing

all of my parts have come back from paint. In the time I was waiting for them, I finished calibrating the fuel tank gauge and tested out all of the instrument. I laid out a wiring schematic and I found a 12 pin power cable plug/socket combination that will serve as a quick disconnect between the fuselage and the Canopy. I want to be able to quickly remove the canopy because I will be hanging the robin from the rafters of my friends hanger. Under me will be 4 sailplanes.  
canopy Frame and Yarmulke

The fwd hinge of the canopy is actually an open hook. The canopy will have to be rotated beyond 90 degrees to release it. there will be two side latches that have yet to be fabricated, that lock the canopy down. The next job I have to work on is modifying the instrument panel bulkhead to add the knee relief we saw that I needed when my friend Mike was sitting in it.








Instrument Panel
Its pretty obvious in this view the modification that needs to be done to the panel Bulkhead. Beneath the canopy is a horizontal foam and glass shear panel. this too will be cut back to the intermediate foam rib shown in the previous picture. The instruments for the first flight will be a combination  CHT/EGT temp gauge, fuel gauge, inclinometer, airspeed and AGL altimeter. Later I will install an Audio Vario in the upper left. The lower middle will be used for a Velcro mount of my I Phone and  Hand held VHF radio.  





Rear fairing being bonded in place
After I trimmed the rear fairing to accommodate the elevator travel, I realized the fairing would be quite narrow and prone to damage if the whole fairing was left on the Horizontal. S i carefully cut the fairing in two and waxed the inside of the lower fairing. I then set the upper and lower fairing back into the mold and laid up a flange that is bonded to the upper fairing only. This will make a nice clean break and keep the fairing halves bonded to their mating structure.




Vert Fin tip cap

pretty self explanatory!!!
















Rudder Tip cap
Same with the rudder, looks like my thumb was covering the lens of my I-phone.















In addition to working on the previous components, I cleaned the Shop and re arranged the equipment to clear the wing tips. The only problem is when i reinstall the wings, I cannot get around in the shop. So I have decided to construct a center set of saw horses to elevate the fuselage 3 feet, I will also build two supports for the wings. I am not very happy with my wing attach design, because I will be redesigning the wings to reduce weight, I have also decided to make a fixed center section and have an external joint. The new design will allow for rapid installation of the wings and automatic disconnect for the ailerons.